Operator: Biogasanlage Bruck/Leitha GmbH
Start-up: 2007
Raw gas capacity: 180 m³/h
First biomethane injection into a public grid, product quality meets ÖVGW G31 and G33 (CH4 > 98 %) for natural gas grid injection.
This plant has been designed, commissioned and optimised within the cooperative research project: